Cost Breakdown
Name/Model: APC TRACKED
Technology: Inner Sphere
Tonnage: 40
Configuration: Tracked Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
Armor (Standard) (150 pts) 9.5 x 10,000 95,000.00
Internal Structure (Standard) 4.0 x 10,000 (+) 40,000.00 = 135,000.00
Control Components 2 x 10,000 (+) 20,000.00 = 155,000.00
Engine (Fusion) (5,000 x 200 x 40) / 75 (+) 533,333.33 = 688,333.33
Turret 0.5 x 5,000 (+) 2,500.00 = 690,833.33
---------------------------------------------------------------------------------------------------------------
Total Structural Cost 690,833.33
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
Bay, Infantry (Foot) (30 troopers) 5 x 15000 (+) 75,000.00 = 175,000.00
Bulldozer 50,000 (+) 50,000.00 = 225,000.00
Flamer (Vehicle) 7,500 (+) 7,500.00 = 232,500.00
Flamer (Vehicle) (Ammo 20) [Empty Bin] 0 (+) 0.00 = 232,500.00
Machine Gun 5,000 (+) 5,000.00 = 237,500.00
Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 237,500.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 237,500.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
Structural Cost 690,833.33
Weapons and Equipment Cost (+) 237,500.00 = 928,333.33
Combat Vehicle Cost Multiplier 1 + (40 / 100) (*) 1.4 = 1,299,666.67
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 1,299,667.00
|