Cost Breakdown
Name/Model: Computer Master C3
Technology: Inner Sphere (Mixed)
Tonnage: 5
Configuration: Hover Combat Vehicle
=====================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------
Armor (Standard) (0 pts) 0.0 x 10,000 0.00
Internal Structure (Standard) 0.5 x 10,000 (+) 5,000.00 = 5,000.00
Control Components 0.5 x 10,000 (+) 5,000.00 = 10,000.00
Lift/Dive Equipment 0.5 x 20,000 (+) 10,000.00 = 20,000.00
Engine (Fusion) (5,000 x 25 x 5) / 75 (+) 8,333.33 = 28,333.33
-----------------------------------------------------------------------------------------------------
Total Structural Cost 28,333.33
=====================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------
C3 Slave 250,000 250,000.00
ECM Suite (C) 200,000 (+) 200,000.00 = 450,000.00
Small Laser 11,250 (+) 11,250.00 = 461,250.00
-----------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 461,250.00
=====================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------
Structural Cost 28,333.33
Weapons and Equipment Cost (+) 461,250.00 = 489,583.33
Combat Vehicle Cost Multiplier 1 + (5 / 50) (*) 1.1 = 538,541.67
-----------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 538,542.00
|