Cost Breakdown
Name/Model: Freebooter
Technology: Inner Sphere
Tonnage: 75
Configuration: Tracked Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
Armor (Standard) (168 pts) 10.5 x 10,000 105,000.00
Internal Structure (Standard) 7.5 x 10,000 (+) 75,000.00 = 180,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 220,000.00
Engine (Fusion) (5,000 x 225 x 75) / 75 (+) 1,125,000.00 = 1,345,000.00
Heat Sinks (Single) 10 x 2,000 (+) 20,000.00 = 1,365,000.00
Turret 1 x 5,000 (+) 5,000.00 = 1,370,000.00
---------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,370,000.00
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
Autocannon/5 125,000 125,000.00
Autocannon/5 (Ammo 20) [Empty Bin] 0 (+) 0.00 = 125,000.00
CASE 50,000 (+) 50,000.00 = 175,000.00
MagShot Gauss Rifle 8,500 (+) 8,500.00 = 183,500.00
MagShot Gauss Rifle 8,500 (+) 8,500.00 = 192,000.00
MagShot Gauss Rifle (Ammo 50) [Empty Bin] 0 (+) 0.00 = 192,000.00
PPC 200,000 (+) 200,000.00 = 392,000.00
PPC 200,000 (+) 200,000.00 = 592,000.00
Sponson Turrets 1.5 x 4,000 (+) 7,500.00 = 599,500.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 599,500.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
Structural Cost 1,370,000.00
Weapons and Equipment Cost (+) 599,500.00 = 1,969,500.00
Combat Vehicle Cost Multiplier 1 + (75 / 100) (*) 1.75 = 3,446,625.00
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 3,446,625.00
|