Cost Breakdown
Name/Model: Longbow
Technology: Clan
Tonnage: 30
Configuration: VTOL Combat Vehicle
====================================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (124 pts) 6.5 x 20,000 130,000.00
Internal Structure (Standard) 3.0 x 10,000 (+) 30,000.00 = 160,000.00
Control Components 1.5 x 10,000 (+) 15,000.00 = 175,000.00
Rotors 3 x 40,000 (+) 120,000.00 = 295,000.00
Engine (XL) (20,000 x 10 x 30) / 75 (+) 80,000.00 = 375,000.00
--------------------------------------------------------------------------------------------------------------------
Total Structural Cost 375,000.00
====================================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------------
Arrow IV System 450,000 450,000.00
Arrow IV System (Ammo 5) [Cluster] [Empty Bin] 0 (+) 0.00 = 450,000.00
Arrow IV System (Ammo 5) [Cluster] [Empty Bin] 0 (+) 0.00 = 450,000.00
CASE 1 x 50,000 (+) 50,000.00 = 500,000.00
ECM Suite 200,000 (+) 200,000.00 = 700,000.00
--------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 700,000.00
====================================================================================================================
Combat Vehicle Cost
--------------------------------------------------------------------------------------------------------------------
Structural Cost 375,000.00
Weapons and Equipment Cost (+) 700,000.00 = 1,075,000.00
Combat Vehicle Cost Multiplier 1 + (30 / 30) (*) 2 = 2,150,000.00
--------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 2,150,000.00
|