Cost Breakdown
Name/Model: Manticore Heavy Tank (XL-MBT)
Technology: Inner Sphere
Tonnage: 60
Configuration: Tracked Combat Vehicle
=================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (178 pts) 9.0 x 25,000 225,000.00
Internal Structure (Standard) 6.0 x 10,000 (+) 60,000.00 = 285,000.00
Control Components 3 x 10,000 (+) 30,000.00 = 315,000.00
Engine (XL) (20,000 x 240 x 60) / 75 (+) 3,840,000.00 = 4,155,000.00
Turret 2 x 5,000 (+) 10,000.00 = 4,165,000.00
-----------------------------------------------------------------------------------------------------------------
Total Structural Cost 4,165,000.00
=================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
Enhanced LRM 10 125,000 (+) 125,000.00 = 175,000.00
Enhanced LRM 10 (Ammo 12) [Empty Bin] 0 (+) 0.00 = 175,000.00
Enhanced LRM 10 (Ammo 12) [Empty Bin] 0 (+) 0.00 = 175,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 575,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 575,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 575,000.00
Medium Re-engineered Laser 100,000 (+) 100,000.00 = 675,000.00
SRM 6 80,000 (+) 80,000.00 = 755,000.00
SRM 6 (Ammo 15) [Empty Bin] 0 (+) 0.00 = 755,000.00
SRM 6 (Ammo 15) [Inferno] [Empty Bin] 0 (+) 0.00 = 755,000.00
Vehicular Grenade Launcher 10,000 (+) 10,000.00 = 765,000.00
Vehicular Grenade Launcher 10,000 (+) 10,000.00 = 775,000.00
Vehicular Grenade Launcher 10,000 (+) 10,000.00 = 785,000.00
Vehicular Grenade Launcher 10,000 (+) 10,000.00 = 795,000.00
-----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 795,000.00
=================================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------------
Structural Cost 4,165,000.00
Weapons and Equipment Cost (+) 795,000.00 = 4,960,000.00
Combat Vehicle Cost Multiplier 1 + (60 / 100) (*) 1.6 = 7,936,000.00
-----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 7,936,000.00
|