Cost Breakdown
Name/Model: PANTHER (WALT) PNT-CWLT
Technology: Inner Sphere
Tonnage: 35
Configuration: Biped BattleMech
=====================================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------------------------
Armor (Standard): (104 pts) 6.5 x 10,000 65,000.00
Internal Structure (Endo Steel): 35 x 1,600 x 1 (+) 56,000.00 = 121,000.00
Myomer (Standard): 35 x 2,000 (+) 70,000.00 = 191,000.00
Engine (XL): (20,000 x 140 x 35) / 75 (+) 1,306,666.67 = 1,497,666.67
Gyro (Standard): 2.0 x 300,000 (+) 600,000.00 = 2,097,666.67
Cockpit (Standard): 200,000 (+) 200,000.00 = 2,297,666.67
Life Support: 50,000 (+) 50,000.00 = 2,347,666.67
Sensors: 35 x 2,000 (+) 70,000.00 = 2,417,666.67
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 2,477,666.67
Arm Actuators: 35 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 16,100.00 = 2,493,766.67
Leg Actuators: 35 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 24,500.00 = 2,518,266.67
-------------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 2,518,266.67
=====================================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------------------------
C3 Slave 250,000 250,000.00
ER PPC 300,000 (+) 300,000.00 = 550,000.00
Jump Jets 35 x (4 x 4) x 200 (+) 112,000.00 = 662,000.00
Narc Missile Beacon 100,000 (+) 100,000.00 = 762,000.00
Narc Missile Beacon (Ammo 6) [Bola] [Empty Bin] 0 (+) 0.00 = 762,000.00
-------------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 762,000.00
=====================================================================================================================================
BattleMech Cost
-------------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 2,518,266.67
Weapons and Equipment Cost: (+) 762,000.00 = 3,280,266.67
BattleMech Cost Multiplier: 1 + (35 / 100) (*) 1.35 = 4,428,360.00
-------------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 4,428,360.00
|