Cost Breakdown
Name/Model: Templar TLR1-OR
Technology: Inner Sphere (Mixed)
Tonnage: 85
Configuration: Biped OmniMech
====================================================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------------------------------------
Armor (Standard): (263 pts) 16.5 x 10,000 165,000.00
Internal Structure (Endo Steel): 85 x 1,600 x 1 (+) 136,000.00 = 301,000.00
Myomer (Standard): 85 x 2,000 (+) 170,000.00 = 471,000.00
Engine (XL): (20,000 x 340 x 85) / 75 (+) 7,706,666.67 = 8,177,666.67
Gyro (Standard): 4.0 x 300,000 (+) 1,200,000.00 = 9,377,666.67
Cockpit (Standard): 200,000 (+) 200,000.00 = 9,577,666.67
Life Support: 50,000 (+) 50,000.00 = 9,627,666.67
Sensors: 85 x 2,000 (+) 170,000.00 = 9,797,666.67
Heat Sinks (Double): 15 x 6,000 (+) 90,000.00 = 9,887,666.67
Arm Actuators: 85 x ((100 x 2) + (50 x 0) + (80 x 0)) (+) 17,000.00 = 9,904,666.67
Leg Actuators: 85 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 59,500.00 = 9,964,166.67
------------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 9,964,166.67
====================================================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
CASE II (C) 175,000 (+) 175,000.00 = 225,000.00
ER PPC (C) 300,000 (+) 300,000.00 = 525,000.00
ER PPC (C) 300,000 (+) 300,000.00 = 825,000.00
LB 10-X AC (C) 400,000 (+) 400,000.00 = 1,225,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] (C) 0 (+) 0.00 = 1,225,000.00
LB 10-X AC (Ammo 10) [Empty Bin] (C) 0 (+) 0.00 = 1,225,000.00
LB 10-X AC (Ammo 10) [Empty Bin] (C) 0 (+) 0.00 = 1,225,000.00
Medium Re-engineered Laser 100,000 (+) 100,000.00 = 1,325,000.00
Medium Re-engineered Laser 100,000 (+) 100,000.00 = 1,425,000.00
Medium Re-engineered Laser 100,000 (+) 100,000.00 = 1,525,000.00
Medium Re-engineered Laser 100,000 (+) 100,000.00 = 1,625,000.00
Medium Re-engineered Laser 100,000 (+) 100,000.00 = 1,725,000.00
------------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,725,000.00
====================================================================================================================================
BattleMech Cost
------------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 9,964,166.67
Weapons and Equipment Cost: (+) 1,725,000.00 = 11,689,166.67
OmniMech Conversion Cost: (9,964,166.67 + 1,725,000.00) x 0.25 (+) 2,922,291.67 = 14,611,458.33
BattleMech Cost Multiplier: 1 + (85 / 100) (*) 1.85 = 27,031,197.92
------------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 27,031,198.00
|