Cost Breakdown
Name/Model: Jenner (PAPA) JR7-AC
Technology: Clan (Mixed)
Tonnage: 35
Configuration: Biped BattleMech
========================================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (119 pts) 6.5 x 20,000 130,000.00
Internal Structure (Endo Steel): 35 x 1,600 x 1 (+) 56,000.00 = 186,000.00
Myomer (Triple-Strength): 35 x 16,000 (+) 560,000.00 = 746,000.00
Engine (XL): (20,000 x 245 x 35) / 75 (+) 2,286,666.67 = 3,032,666.67
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 3,932,666.67
Cockpit (Standard): 200,000 (+) 200,000.00 = 4,132,666.67
Life Support: 50,000 (+) 50,000.00 = 4,182,666.67
Sensors: 35 x 2,000 (+) 70,000.00 = 4,252,666.67
Heat Sinks (Double): 11 x 6,000 (+) 66,000.00 = 4,318,666.67
Arm Actuators: 35 x ((100 x 2) + (50 x 0) + (80 x 0)) (+) 7,000.00 = 4,325,666.67
Leg Actuators: 35 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 24,500.00 = 4,350,166.67
------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 4,350,166.67
========================================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------------------------
CASE 1 x 50,000 50,000.00
ER Small Laser 11,250 (+) 11,250.00 = 61,250.00
ER Small Laser 11,250 (+) 11,250.00 = 72,500.00
ER Small Laser 11,250 (+) 11,250.00 = 83,750.00
ER Small Laser 11,250 (+) 11,250.00 = 95,000.00
Heavy Large Laser 250,000 (+) 250,000.00 = 345,000.00
Jump Jets 35 x (7 x 7) x 200 (+) 343,000.00 = 688,000.00
Streak SRM 6 120,000 (+) 120,000.00 = 808,000.00
Streak SRM 6 (Ammo 15) [Empty Bin] 0 (+) 0.00 = 808,000.00
------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 808,000.00
========================================================================================================================
BattleMech Cost
------------------------------------------------------------------------------------------------------------------------
Structural Cost: 4,350,166.67
Weapons and Equipment Cost: (+) 808,000.00 = 5,158,166.67
BattleMech Cost Multiplier: 1 + (35 / 100) (*) 1.35 = 6,963,525.00
------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 6,963,525.00
|