Cost Breakdown
Name/Model: Alacorn Heavy Tank (SD) "Safety Dance" v2
Technology: Inner Sphere
Tonnage: 95
Configuration: Tracked Combat Vehicle
=============================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (215 pts) 12.0 x 20,000 240,000.00
Internal Structure (Standard) 9.5 x 10,000 (+) 95,000.00 = 335,000.00
Control Components 5 x 10,000 (+) 50,000.00 = 385,000.00
Engine (Fusion) (5,000 x 285 x 95) / 75 (+) 1,805,000.00 = 2,190,000.00
Heat Sinks (Single) 2 x 2,000 (+) 4,000.00 = 2,194,000.00
Turret 3 x 5,000 (+) 15,000.00 = 2,209,000.00
-------------------------------------------------------------------------------------------------------------
Total Structural Cost 2,209,000.00
=============================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------
C3 Slave 250,000 250,000.00
CASE 50,000 (+) 50,000.00 = 300,000.00
Combat Vehicle Escape Pod 10,000 (+) 10,000.00 = 310,000.00
ER Large Laser 200,000 (+) 200,000.00 = 510,000.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 710,000.00
Light Gauss Rifle 275,000 (+) 275,000.00 = 985,000.00
Light Gauss Rifle 275,000 (+) 275,000.00 = 1,260,000.00
Light Gauss Rifle (Ammo 16) [Empty Bin] 0 (+) 0.00 = 1,260,000.00
Light Gauss Rifle (Ammo 16) [Empty Bin] 0 (+) 0.00 = 1,260,000.00
Recon Camera 10,000 (+) 10,000.00 = 1,270,000.00
-------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,270,000.00
=============================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------------
Structural Cost 2,209,000.00
Weapons and Equipment Cost (+) 1,270,000.00 = 3,479,000.00
Combat Vehicle Cost Multiplier 1 + (95 / 100) (*) 1.95 = 6,784,050.00
-------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 6,784,050.00
|